At OIP Industrial City Phase one Roads & Infrastructure
Excavation , Backfilling , Grading & Basecource for Project's Roads With Total Length Of About 19 KM
Asphalt ( Binding & Surface ) Course & Intelock for Project's Roads With Total Length Of About 19 KM
Sewage Network Including Over 800 Manholes ( Main Lines & Catch Basin ) and Over 18 KM Pipe Lines
Water Network Including Over 17 KM Pipe Lines
Fire Network Including Over 14 KM Pipe Lines Including Valvs & Fire Hidrants.
At OIP Industrial City Phase two Roads & Infrastructure
Excavation , Backfilling , Grading & Basecource for Project's Roads With Total Length Of About 22 KM
Asphalt ( Binding & Surface ) Course & Intelock for Project's Roads With Total Length Of About 22 KM
Sewage Network Including Over 900 Manholes ( Main Lines & Catch Basin ) and Over 19.5 KM Pipe Lines
Water Network Including Over 18.5 KM Pipe Lines
Fire Network Including Over 15 KM Pipe Lines Including Valvs & Fire Hidrants.